Construction Marathon 4-15-2012

A nice day and generous parents led me to a construction marathon this afternoon. I spent a total of 8 straight hours cutting, trimming, fixing, gluing, tacking, and screwing.

I built the frames for the East and South valance. And I screwed up in two ways.

  1. I cut the East valance at 17″. It should have been 18″
  2. I tacked the skin to the underside of the valance. It was supposed to go on top.

I can live with the narrow valance, because I have a 2 1/2″ ledgerboard that will hide the mistake. I think I’ll need to cut another skin to go on top of the valance frame, so if I put stuff on it it doesn’t punch out the bottom.

I cut the deck for the closet. I used the deck that I had screwed up cutting the West deck. I made the main cuts on the new West deck. I cut the final 12″ section of the East deck.

I installed additional ledger boards along the West and East sides of the layout. I also, added a few braces to stiffen the frame.

I cut the L-girder ledger boards for the valance. The East board is installed. The South board had to be removed because I didn’t cut it correctly. I recut the South board, but haven’t had a chance to reinstall it.

I cut and glued L-girders for the closet frame.

Very productive day. I went through 2 sheets of 3/4″ plywood; 2/3 sheet of 1/16″ plywood; one box of 1 1/4″ brads; one box of 5/8″ brads; one box 1 1/4″ FastTap screws. I also depleted my supply of 3″ Spax screws and 1 1/4″ pan-head Spax screws. I used just about every tool I have: table saw; miter saw; skil saw; jjg saw; router; brad nailer; drill; vacuum; trammel; tape measure; square.

 1,013 

Author: Greg Amer

Leave a Reply

Your email address will not be published. Required fields are marked *


6 − five =

This site uses Akismet to reduce spam. Learn how your comment data is processed.