I’ve mostly completed the major benchwork for The Industrial Lead. I have a couple of tasks to complete:

  1. Install drawer fasces.
  2. Fix Formica chips with SeamFil

But at least for now I’m able to move out the woodworking tools, clean up the major dust and start focusing on actually building the railroad.

View in youTube: The Industrial Lead – Benchwork Complete

Bookmark and Share

Greg Amer

  One Response to “Benchwork Complete – Video”

  1. Checking things off:

    Drawers Installated

 Leave a Reply

(required)

(required)


+ seven = 14

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

   
© 2012 Greg Amer
Suffusion theme by Sayontan Sinha