Track Plan 36

 Posted by Greg Amer at 2:56 pm  Track Plan  Add comments
Jun 252012
 

 

Track Plan - Industrial Lead 36

Track Plan - Industrial Lead 36

 

 

A little more dramatic redesign. Put’s Franz Bakery in the closet. Terminal 115 out in front of the Yard. Slides Seattle Lighting south and makes it a curved building. Reduce the “yard” to two tracks.

Primary reason for the changes is to better accomodate elevation changes from top of Industrial Lead down to the hole.

Drawn with AnyRail

Bookmark and Share

Greg Amer

 Leave a Reply

(required)

(required)


9 − = zero

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

   
© 2012 Greg Amer
Suffusion theme by Sayontan Sinha