Track Plan 36

 

Track Plan - Industrial Lead 36
Track Plan - Industrial Lead 36

 

 

A little more dramatic redesign. Put’s Franz Bakery in the closet. Terminal 115 out in front of the Yard. Slides Seattle Lighting south and makes it a curved building. Reduce the “yard” to two tracks.

Primary reason for the changes is to better accomodate elevation changes from top of Industrial Lead down to the hole.

Drawn with AnyRail

 1,144 

Author: Greg Amer

Leave a Reply

Your email address will not be published. Required fields are marked *


five − = 3

This site uses Akismet to reduce spam. Learn how your comment data is processed.