Track Plan – Industrial Lead 22

 Posted by Greg Amer at 10:47 pm  Add comments
 
Track Plan - Industrial Lead 22

Alternative plan with #8 turnouts and 28″ minimum radius curves.

Bookmark and Share

Greg Amer

 Leave a Reply

(required)

(required)


three + 4 =

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

© 2012 Greg Amer
Suffusion theme by Sayontan Sinha