Jun 052013
 

This video shows how to lay guard rails for the Switch-Works “Ultimate” turnout. Switch-Works is a set of jigs for assembling “Museum Standard” track featuring wooden ties, metal tie plates, etched frogs and machined points.

As part of the 4th Div. PNR NMRA Spring Meet, Andy Reichert’s Proto:87 Stores was kind enough to lend us some of the Switch-Works tools and provide us with kits for a clinic on how to build the “Ultimate Turnout”.  As a special thanks to Andy I wanted to put out some videos to help promote Proto:87 Stores products.

Find more help building the Switch-Works “Ultimate” turnout visit http://www.proto87.com/handlaid-turnout-reference-manual.html

Guard Rail Check Gauge

Guard Rail Check Gauge

Bookmark and Share

Greg Amer

 Leave a Reply

(required)

(required)


seven − = 6

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

   
© 2012 Greg Amer
Suffusion theme by Sayontan Sinha