Month: April 2012

Track Plan - Industrial Lead 23

Track Plan 23

Not much change. Just made it 1″ wider on the south and west sides to reflect the benchwork.

Benchwork (65)

Finishing the Main Deck

I was able finish up cutting the main deck. I cut a filler piece for the east wall, filled a…

Benchwork (59)

Valance Brackets

I painted the top and underside of the valance Polar White. Then installed the triangle brackets that provide the permanent…

Camp Trailer

There are quite a few campers, camp trailers and motor homes in the area. I’ll probably model one like the…

Benchwork (53)

Benchwork Continues – Into the Closet

More benchwork today. I started with a tricky section that would be the sub-roadbed where the main layout enters the…

Benchwork (46)

Touch up and Valance 4-16-2012

A couple extra hours of work allowed me to do a little touch up and finish out the valance frame….

Benchwork (37)

Construction Marathon 4-15-2012

A nice day and generous parents led me to a construction marathon this afternoon. I spent a total of 8…

TILX 170357

TILX 170357

ARMN 461808

ARMN 761808

PCC Logistics